• Foundation
    R.C. Foundation
  • Structure
    Reinforced concrete
  • Walls
    Common bricks
  • Roof
    Reinforced concrete flat roof with waterproofing system
  • Ceiling
    Retail Area
    - Concrete slab with skim coat and paint finish

    Washroom
    - Ceiling board with paint finish

  • Finishes
    WALLS
    Retail Area
    - Plaster and paint

    Washroom
    - Ceramic wall tiles to ceiling height


    FLOORING
    Retail Area
    - Off-form concrete

    Washroom
    - Non-slip floor tiles


    DOORS
    Entrance
    - Mild steel roller shutter

    Office (if applicable)
    - Timber flush door with mild steel frame

    Washroom
    - 1 no. wall-hung basin and tap
    - 1 no. quality water closet
    - 1 no. toilet paper roll holder

  • Ironmongery
    Quality locksets
  • Sanitary Wares & Fittings
    Washroom
    - 1 no. wall-hung basin and tap
    - 1 no. quality water closet
    - 1 no. toilet paper roll holder





    Electrical Installation
    As per M&E Consultant’s requirements